Knowledge

Detailed Analysis of the Boom Structure

Detailed Analysis of the Boom Structure

The crane uses the pulley block at the top of the boom to support the hoisting wire rope to hang the weight, 

and the lifting height and working radius are changed by the length and inclination of the boom. 

Therefore, the crane boom is most important part of the crane. The crane boom structure is as follows:


The boom of the crane generally comprises two parts, a main arm and a jib. There are two main types of crane main booms, one is a truss structure boom welded by profiles and pipes, and the other is a box-type boom with various sections. 

With the development of cranes, most of the crane main booms are now box-type structures, and only a small part is a truss structure. The function of the jib of the crane is that when the height of the main arm is not satisfactory, the jib can be connected at the end of the main arm to achieve the purpose of lifting the object to a height. The jib can only lift lighter objects. The jib generally has only one arm, and there are two or more folding jibs or telescopic jibs, of which the jib of the folding truss structure is the most common.


Knowing the structure of the boom, we understand the key points of the performance of the crane. When purchasing, the user can choose the product that suits his or her needs according to the specific work needs. 


The undercarriage parts  manufacturer relies on strong technical strength, excellent product quality and perfect After-sales service, Main product is track shoe, bottom roller,  top roller, sprocket, idler,ect .We sincerely welcome inquiry.